After the rain, we got a lot done. The roof framing is complete with braces. We have the four vents assembled with the panels in them. All that is left is assembling the doors, and placing the panels in the openings. You know, we have all been theorizing about ventilation, but the simple thing to do would be to simply remove a few vertical panels from the walls during the summer. After all, they are just held in by little wire clips, and taking them in and removing them would be a snap. I could store the panels in another outbuilding I have so they would not be damaged. Here is the first pic:
Bill in SC
Greenhouse build: Day 3 since it rained
- Bill in SC
- Posts: 2544
- Joined: Thu Jun 16, 2005 5:17 am
- Location: South Carolina, USA
- Bill in SC
- Posts: 2544
- Joined: Thu Jun 16, 2005 5:17 am
- Location: South Carolina, USA